Project cost · modeled example

Mudroom Addition Cost (2026): $44,768 to $68,873 for an 8x10

An 8x10 heated mudroom on a new foundation costs about $44,768 to $68,873, from a $34,437 direct job cost: framed, roofed, sided, wired, heated and finished with a built-in bench, every line itemized with crew hours.

Direct answer: Adding an 8x10 mudroom on a new foundation costs about $44,768 to $68,873, from a direct job cost of $34,437 for this 80 sf heated mudroom. Direct job cost is labor and materials only, with no contractor overhead or profit, and is not a price: no contractor performs work at job cost. Permit and inspection fees are not included.
Clamp's Generate from description screen with the 8x10 mudroom described in plain words

Describe it

The mudroom estimate in Clamp's builder grouped by trade

Every line, by trade

The mudroom in the Clamp app: described the way you would say it, then every line grouped by trade in the estimate builder. Sample data. Illustration of the Clamp app.

The job at a glance

One build, fully itemized, with crew hours.

BuildJob costLaborCrew hoursMaterialsIllustrative selling price
A. 8x10 mudroom on a new foundation$34,437$18,803249 to 303 h$8,859$44,768 to
$68,873

Dump fees and other costs ($6,775) are the same in every build and included in the job cost. Materials include allowances. Illustrative selling price is the job cost at a 30% to 100% markup; your price depends on your own overhead and profit. Labor hours are a planning range and include setup, daily cleanup and material runs; they are never a charge to the customer. Permit and inspection fees are not included; requirements vary by jurisdiction.

Which price is closer to yours?

  • Lean, +30%: A handyman or owner-operator who does the work with a small crew and no office. Usually the lowest quote. The owner handles scheduling, questions and callbacks around the work itself.
  • Standard, +50%: A remodeling company with a crew, an office, insurance and someone to answer the phone. Close to the average remodeler's overhead in the National Association of Home Builders cost-of-doing-business survey.
  • Full-Service, +100%: A design-build firm with designers, a salesperson and a project manager who runs the job. The extra pays for planning, coordination and one point of contact from design to final inspection.

Higher markup means more business behind the job, not by itself better work, and a lower markup is not by itself a better deal. For contractors: how each markup splits into overhead and profit is in the overhead categories guide.

The build in detail

A. 8x10 mudroom on a new foundation: $34,437

The patio section comes out, a frost footing goes in, and the room is framed, roofed into the existing wall, sided, insulated, wired, heated off the existing ductwork and finished with LVP and a built-in bench. Labor is $18,803 of the $34,437 job cost, or 54.6%. It is about 249 to 303 hours of work, including setup, daily cleanup and material runs.

Labor cost by trade

Labor only. Materials, allowances and dump fees are in the line items below. Hours are person-hours at typical production from Clamp’s labor hours catalog, as a range: a planning figure, not a schedule and not a charge to the customer.

TradeHoursLabor costLean×1.30Standard×1.50Full-Service×2.00
Permits & PM44 to 75 h$4,865$6,325$7,298$9,730
Demo & Prep1 to 3 h$119$155$179$238
Siteworkunder 1 h$49$64$74$98
Masonry15 to 28 h$1,449$1,884$2,174$2,898
Electrical12 to 19 h$1,885$2,451$2,828$3,770
HVAC16 to 23 h$1,943$2,526$2,915$3,886
Insulation1 to 2 h$110$143$165$220
Drywall12 to 22 h$824$1,071$1,236$1,648
Carpentry45 to 61 h$3,995$5,193$5,992$7,990
Flooring1 to 4 h$255$331$382$510
Painting16 to 24 h$1,375$1,787$2,062$2,750
Exterior10 to 15 h$879$1,143$1,318$1,758
Cleanup & Disposal3 to 9 h$300$390$450$600
Roofing6 to 9 h$637$828$955$1,274
Landscaping1 to 4 h$118$153$177$236
Setup, cleanup and material runs17 to 54 hin the prices
All labor249 to 303 h$18,803$24,444$28,205$37,606

Every line item

Labor $18,803 + materials and allowances $8,859 + dump fees and other $6,775 = $34,437 direct job cost. Hours are person-hours at typical production, on labor rows only, and the direct-cost row adds about 15% for setup, daily cleanup and material runs; an allowance or material row names the labor line that installs it, and a subcontract row has none, because the sub’s price includes their own time. Some labor quantities include a difficulty factor, so they can exceed the measured area; each row’s derivation is in the downloadable data.

ItemQtyUnitHoursLaborMaterialLine cost
Permits & PM
Daily Cleanup and Staging7ea15 to 34 h$1,540$0$1,540
Engineering Review Allowance1ea$0$0$850
Jobsite Supervision Labor35hr22 to 48 h$3,325$0$3,325
Permit Drawing Set (Design and Drafting)1ea$0$0$3,375
Permits & PM subtotal44 to 75 h$9,090
Permits & PM subtotal44 to 75 h$9,090
Demo & Prep
Exterior Demolition Labor72sf1 to 2 h$115$0$115
Floor Protection Labor, Access Path Through the House8sfunder 1 h$4$0$4
Demo & Prep subtotal1 to 3 h$119
Demo & Prep subtotal1 to 3 h$119
Sitework
Excavation Spoils Export (Per Cubic Yard)6cy$0$0$252
Foundation Excavation (Machine, Per Cubic Yard)10cy$0$0$520
Portable Toilet Rental (per month)2month$0$0$450
Site Grading Labor215sfunder 1 h$49$0$49
Sitework subtotalunder 1 h$1,271
Sitework subtotalunder 1 h$1,271
Masonry
Concrete Footing Install Labor27lf4 to 9 h$297$0$297
Concrete Footing MaterialsLabor on: Concrete Footing Install Labor29.7lf$0$431$431
Foundation Pour Labor2.68cy9 to 21 h$1,152$0$1,152
Foundation Pour MaterialsLabor on: Foundation Pour Labor2.95cy$0$841$841
Masonry subtotal15 to 28 h$2,721
Masonry subtotal15 to 28 h$2,721
Electrical
New Circuit Install Labor (Added Circuit)2ea3 to 9 h$850$0$850
Dedicated Circuit BreakerLabor on: New Circuit Install Labor (Added Circuit)2ea$0$48$48
Electrical Box and Device MaterialsLabor on: Electrical Rough-In Per Device7ea$0$60$60
Electrical Rough-In Per Device7ea2 to 6 h$385$0$385
Light Fixture AllowanceLabor on: Light Fixture Install1ea$0$150$150
Light Fixture Install1ea1 to 2 h$125$0$125
Outlet/Switch Install6ea1 to 4 h$270$0$270
Outlet UnitLabor on: Outlet/Switch Install4ea$0$11$11
Recessed Light (Can or Wafer)Labor on: Recessed Light Install Labor, Open Ceiling2ea$0$34$34
Recessed Light Install Labor, Open Ceiling2ea1 to 2 h$170$0$170
Romex Wire MaterialsLabor on: Electrical Rough-In Per Device172.5lf$0$138$138
Smoke and CO DetectorLabor on: Smoke/CO Detector Install1ea$0$55$55
Smoke/CO Detector Install1eaunder 1 h$85$0$85
Switch UnitLabor on: Outlet/Switch Install2ea$0$14$14
Electrical subtotal12 to 19 h$2,395
Electrical subtotal12 to 19 h$2,395
HVAC
Ductwork Install30lf3 to 9 h$435$0$435
Ductwork MaterialsLabor on: Ductwork Install42lf$0$326$326
Ductwork Modification10lf3 to 7 h$420$0$420
HVAC Commissioning and Balance1ea1 to 5 h$550$0$550
HVAC Load Calculation Labor1ea2 to 6 h$350$0$350
Register BootLabor on: Ductwork Install3ea$0$105$105
Register and Grille Install3eaunder 1 h$60$0$60
Return Duct Install Labor15lf1 to 2 h$128$0$128
Return Duct MaterialsLabor on: Return Duct Install Labor15lf$0$143$143
HVAC subtotal16 to 23 h$2,517
HVAC subtotal16 to 23 h$2,517
Insulation
Air Sealing Package, New Framing (per sf)80sf$0$0$60
Attic Blown Insulation, Installed (per sf at R-49)80sf$0$0$132
Floor Insulation from Below, Installed (per sf)80sf$0$0$207
Eave Ventilation Baffle (per rafter bay)9eaunder 1 h$72$0$72
Insulation Dam Install Labor1eaunder 1 h$38$0$38
Insulation Dam MaterialsLabor on: Insulation Dam Install Labor1ea$0$75$75
Vapor Retarder (per sf)80sf$0$0$68
Wall Batt Insulation, Installed (per sf)214.66sf$0$0$311
Insulation subtotal1 to 2 h$963
Insulation subtotal1 to 2 h$963
Drywall
Drywall Finish Labor366.22sf7 to 15 h$549$0$549
Drywall Hang Labor366.22sf3 to 8 h$275$0$275
Drywall Sheets MaterialsLabor on: Drywall Hang Labor402.84sf$0$302$302
Drywall subtotal12 to 22 h$1,126
Drywall subtotal12 to 22 h$1,126
Carpentry
Floor System Framing Labor80sf3 to 7 h$360$0$360
Floor System Framing MaterialsLabor on: Floor System Framing Labor84sf$0$378$378
Custom Built-In Carpentry6lf8 to 19 h$855$0$855
Door Lock Hardware AllowanceLabor on: Exterior Door Install1ea$0$150$150
Door Unit AllowanceLabor on: Exterior Door Install1ea$0$950$950
Exterior Door Install1ea6 to 14 h$675$0$675
Exterior Wall Framing MaterialsLabor on: Stud Wall Framing Install28.17lf$0$380$380
Roof Rafter/Truss Framing0.92square2 to 5 h$391$0$391
Sheathing Install306.66sf2 to 5 h$383$0$383
Stud Wall Framing Install26.83lf3 to 8 h$483$0$483
Hook Strip Install Labor4lfunder 1 h$34$0$34
Hook Strip MaterialsLabor on: Hook Strip Install Labor4lf$0$26$26
Open Shelving and Bench MaterialsLabor on: Custom Built-In Carpentry6.6lf$0$224$224
Roof Framing MaterialsLabor on: Roof Rafter/Truss Framing0.97square$0$267$267
Baseboard and Casing Install36lf1 to 2 h$153$0$153
Trim MaterialsLabor on: Baseboard and Casing Install39.6lf$0$83$83
Wall Sheathing MaterialsLabor on: Sheathing Install236.13sf$0$224$224
Window Caulk and Flash MaterialsLabor on: Window Install2ea$0$96$96
Window and Door Install ConsumablesLabor on: Exterior Door Install1ea$0$48$48
Window Install2ea5 to 11 h$481$0$481
Window Interior Trim Install Labor2ea1 to 4 h$180$0$180
Window Interior Trim MaterialsLabor on: Window Interior Trim Install Labor34lf$0$110$110
Window Unit AllowanceLabor on: Window Install2ea$0$575$575
Carpentry subtotal45 to 61 h$7,506
Carpentry subtotal45 to 61 h$7,506
Flooring
Floor Transition MaterialsLabor on: Door Threshold Transition Labor1ea$0$35$35
Floor Underlayment Materials80sf$0$44$44
Flooring Install Consumables0.4ea$0$34$34
LVP/LVT Install80sf1 to 3 h$180$0$180
Door Threshold Transition Labor1eaunder 1 h$75$0$75
LVP/LVT Material AllowanceLabor on: LVP/LVT Install88sf$0$308$308
Flooring subtotal1 to 4 h$676
Flooring subtotal1 to 4 h$676
Painting
Paint Finish on New Built-ins6lf6 to 13 h$691$0$691
Interior Ceiling Paint Apply Labor80sfunder 1 h$77$0$77
Interior Paint Apply Labor286.22sf2 to 6 h$206$0$206
Paint Masking Setup Labor286.22sfunder 1 h$17$0$17
Premium Paint AllowanceLabor on: Interior Paint Apply Labor2.58gallon$0$124$124
Paint Prep Labor366.22sf1 to 3 h$81$0$81
Paint Primer Application Labor366.22sf1 to 2 h$146$0$146
Primer MaterialsLabor on: Paint Primer Application Labor1.53gallon$0$49$49
Paint Sundries Materials1ls$0$150$150
Trim Caulk and Filler MaterialsLabor on: Trim Paint Apply Labor36lf$0$8$8
Trim Paint Apply Labor70lf1 to 4 h$157$0$157
Painting subtotal16 to 24 h$1,706
Painting subtotal16 to 24 h$1,706
Cabinets & Countertops
Cabinet Install Fasteners and ShimsLabor on: Custom Built-In Carpentry6lf$0$14$14
Cabinets & Countertops subtotal$14
Cabinets & Countertops subtotal$14
Exterior
Exterior Caulking and Sealing Labor20lfunder 1 h$35$0$35
Exterior Trim Install18lf1 to 2 h$81$0$81
House Wrap Install Labor214.66sf1 to 3 h$82$0$82
House Wrap MaterialsLabor on: House Wrap Install Labor236.13sf$0$99$99
Soffit and Fascia Install27lf2 to 6 h$230$0$230
Soffit and Fascia MaterialsLabor on: Soffit and Fascia Install27lf$0$230$230
Vinyl Siding Install Labor214.66sf3 to 7 h$451$0$451
Vinyl Siding MaterialsLabor on: Vinyl Siding Install Labor236.13sf$0$732$732
Exterior Window and Door Trim MaterialsLabor on: Exterior Trim Install18lf$0$58$58
Exterior subtotal10 to 15 h$1,998
Exterior subtotal10 to 15 h$1,998
Cleanup & Disposal
Dumpster Rental Weekly1week$0$0$550
Final Cleanup1ea3 to 9 h$300$0$300
Cleanup & Disposal subtotal3 to 9 h$850
Cleanup & Disposal subtotal3 to 9 h$850
Roofing
Asphalt Shingle Install Labor0.92square1 to 2 h$147$0$147
Asphalt Shingle MaterialsLabor on: Asphalt Shingle Install Labor1.01square$0$177$177
Downspout Install Labor2ea1 to 3 h$150$0$150
Downspout MaterialsLabor on: Downspout Install Labor2ea$0$110$110
Drip Edge MaterialsLabor on: Asphalt Shingle Install Labor40.28lf$0$38$38
Gutter Install Labor18lf1 to 2 h$99$0$99
Gutter MaterialsLabor on: Gutter Install Labor19.8lf$0$109$109
Ice Water Shield Install Labor0.14squareunder 1 h$6$0$6
Ice Water Shield MaterialsLabor on: Ice Water Shield Install Labor0.14square$0$13$13
Magnetic Nail Sweep Labor1ea1 to 3 h$140$0$140
Ridge Vent Install Labor11.51lfunder 1 h$29$0$29
Ridge Vent MaterialsLabor on: Ridge Vent Install Labor11.51lf$0$49$49
Step Flashing Install Labor11lfunder 1 h$38$0$38
Step Flashing MaterialsLabor on: Step Flashing Install Labor12.1lf$0$21$21
Synthetic Underlayment Install Labor0.92squareunder 1 h$28$0$28
Synthetic Underlayment Materials0.97square$0$21$21
Roofing subtotal6 to 9 h$1,175
Roofing subtotal6 to 9 h$1,175
Landscaping
Sod Install Labor215sf1 to 4 h$118$0$118
Sod MaterialsLabor on: Sod Install Labor225.75sf$0$192$192
Landscaping subtotal1 to 4 h$310
Landscaping subtotal1 to 4 h$310
DIRECT JOB COST249 to 303 h$34,437
DIRECT JOB COST249 to 303 h$34,437

Methodology & reproducibility

One reviewed snapshot for this build. The build is frozen from its own estimate run and priced by the published pricer.

Direct cost equals the sum of each row’s rounded quantity × (labor + material + other). Amounts are shown in whole dollars; every column adds to its total.

Scope selection, prose accuracy, arithmetic and provenance mapping reviewed; not independent market-rate verification.

Questions

What does a mudroom addition cost per square foot?

This 80 sq ft mudroom is $430.46 a square foot in direct cost, about $560 to $861 a square foot sold. A bigger room costs less per square foot, because lines like the permit drawings and project management ($9,090 here), the heat and the electrical change little with the floor area. To price your size, describe it in the free estimate.

What drives the cost of a small addition?

The foundation, the shell and the trades show up at almost any size: excavation, footings, framing, roofing tied into the house, siding, insulation, electrical, HVAC, drywall and paint. At 80 sf they spread over few feet, which is why small additions cost more per square foot than houses.

What does this leave out?

Permit fees, structural surprises beyond the engineering review allowance, and any plumbing. The markup table shows illustrative selling prices; direct job cost is not a price.

What would a bathroom in the addition add?

This build has none. A bath adds rough plumbing, fixtures, tile and ventilation; describe one in the estimator to price it for your job.

Related

Sources & provenance

  1. 8x10 mudroom on a new foundation reviewed snapshot Clamp Research
Changes: Oct 11, 2026: Initial publication: reviewed snapshots frozen from saved estimate runs, priced on the current baseline.; Oct 11, 2026: Line items open with trade subtotals and hours, matching the 5x8 page.; Nov 3, 2026: Added the cost per square foot and put the price range in the title and summary.; Nov 10, 2026: Repriced at the November 2026 catalog from the same saved estimate run. Foundation pour labor is $430 a yard (was $575), air sealing is one line, and painting the built-ins is $691 (was $288). Direct job cost $34,437 (was $35,588).